Kitchen: So close!

Progress hasn't sped up at all on the kitchen, but we have been making some.  Our unofficial deadline is to have it functional by the end of this week.  Deep breaths!

Handsome Handy Hubby has put in another huge week both at work and at home to get us closer to the end.  He's exhausted which doesn't make it easy to do stuff.  I have so much admiration for this man who just digs in and gets on with the job.  Last week, his day job was a bit of a nightmare and he worked late every day.  Bad enough that he starts at 5am but pulling 12 hour shifts day after day isn't fun.  Then they called him in to work on Saturday ... he could have said no, but the money will come in handy so in he went.  Sunday I thought he'd want to have a bit of a break, and we did have pancakes with friends for breakfast.  But then, as soon as we got home he was into it.  Just one more reason to love that man.

Here's what things looked like at about 5:30pm yesterday.

The pantry doors are on - and the inside is about 80% complete.  The fridge is in and working.

We had to take the sliding door on the right edge of this photo off to get the fridge in.

We didn't put the screen back on the sliding door and look at the sun coming in under the deck roof and hitting the hallway wall about 5 meters away.  This is definitely a problem at dinner time but the light flooding in is wonderful.

The range hood still has to go over the cook top, and the dishwasher in it's hole.  The oven and microwave have been getting a work out though.

All the drawers are finally in.  The plumbing is also connected for the sink. Love that we've used the floorboards for the kick plates as well.
Our beautiful bamboo floors have been re-laid and look just as stunning as the first time they went down 18 months ago. 
This photo certainly doesn't do the floors any justice but I just had to capture that sunshine hitting the hallway wall.  You can imagine at dinner time sitting here sweating it out and squinting against the sun.  Any solution we've tried to deal with it also cuts down the amount of light that comes in quite severely.  Don't know what we're going to do about it but we'll figure it out eventually.

I also made my 3rd trip for this kitchen to Ikea.  I returned all the bits and pieces that we didn't use, bought a few more things that we needed, and a few that will help finish things off.  I came out about $1,000 better off than when I walked in so that was a bonus.  My Dad came with me as I had a couple of heavy items to return and he and Mum decided to get an Expedit.  I think it was a bit of a shock to him how big it was and just how long it took us to get around.  We were bout 3 hours all up which I thought was pretty good considering we did returns and collected more kitchen items as well.  He did say the lunch (he's a fish eating vegetarian) was certainly better than he would have had at McDonalds on the way home.

We've managed to cross quite a few things off the To Do list:
  • Finish painting the pantry
  • Reinstall all the pantry shelving
  • Reinstall the pantry doors
  • Put the screws in the back of all those drawers and level everything up
  • Connect the plumbing
  • Put crown moulding up so that the pantry/fridge cabinet goes to the ceiling as well as the oven and small appliances cabinet.
  • Relay the bamboo floor boards
  • Bring in the fridge and dishwasher
  • Find all the kitchen stuff stashed in various places around the house and in the garage and get it all where it belongs
  • Find all the laundry stuff stashed in various places around the house and put it back in the laundry/temporary kitchen
  • Add some styling and fancy accents
  • Clean the rest of the house which has been descending into chaos while our time and energy are focused on the kitchen.
We're certainly not going to get everything done by the end of this week, but we should be able to get to the point where it's a functional kitchen.  We'll then have to work around that to finish it off.  CAN. NOT. WAIT!

Kitchen: Shaping Up

We've come a long way ... albeit slowly ... with our kitchen renovation.




It is shaping up into our dream kitchen and we've ticked off a lot of things on the list to get it this far.
 
The oven, microwave and induction cook top are all installed. All the Ikea cabinets are in ... we just need some extra hinges and drawers (naturally).  This involves an 3 hour round trip + instore time.  We know we'll have some items to return at the end, so we're waiting another week or so before making the trek.
 

Don't you love the composition of this photo with the step ladder in the foreground ... kidding of course.  I just like to keep it real.  If you look closely, you'll see my lunch heating up in the mircrowave while I snapped these photos today.

Under the bench there you can see cupboard doors.  We put narrow depth cupboards along here for extra storage as our house has almost none.

 
This shows a little more of our lovely benchtops, littered with construction debris of course.  We chose Ceasarstone in Oyster.  An option that's available direct from Ikea, but it was actually cheaper for us to get it through a local stone mason who just happens to be one of the best there is.  More about that later.  The hole under the bench in the top right corner above is for our dishwasher.  Yes, it's on the opposite side of the area to our sink.  No, we don't think that is a problem.  We're not 'rinse before it goes in the dishwasher' people - unless there's a load of sauce/gravy on the plate so we don't think there will be a lot of need to drip water across the floor.  On the odd occasion that there is, there are these wonderful things called dish towels or even paper towel which can mop those drips right up.  Amazing!

 
This beast of construction will eventually be our walk in panty.  The fridge goes in the hole on the right there with the (already in use) wine rack above it.  There will be bifold doors (leaning against the wall over there on the left of the hallway door) right across the front of the pantry which will allow the whole thing to open up and be easily accessible.  Inside there is lots of shelves and a couple of baskets - see some of them on the floor in the fridge hole and the rest of the shelves on the bench.
 
I haven't shown it in any photos but the left hand end of the pantry is a big blank wall.  It's just crying out for a chalk board for our Little Miss and some art, maybe it will become her area with a chalk board and rotating gallery of art sent home from day care, colouring in and sticker collages. 
 
My goal today is to finish painting the uprights so that Handsome Handy Hubby can finish the shelves and reinstall the doors.  We could have made the pantry a little shallower and still been able to step into it, but we're pretty happy with how it's turned out so far.
 
Still to do...
  • Finish painting the pantry
  • Reinstall all the pantry shelving
  • Reinstall the pantry doors
  • Put the screws in the back of all those drawers and level everything up
  • Connect the plumbing
  • Put crown moulding up so that the pantry/fridge cabinet goes to the ceiling as well as the oven and small appliances cabinet.
  • Relay the bamboo floor boards
  • Bring in the fridge and dishwasher
  • Find all the kitchen stuff stashed in various places around the house and in the garage and get it all where it belongs
  • Find all the laundry stuff stashed in various places around the house and put it back in the laundry/temporary kitchen
  • Add some styling and fancy accents
  • Clean the rest of the house which has been descending into chaos while our time and energy are focused on the kitchen.
We are hoping to be finished by the end of this month.  I think we can do it but boy is it going to be busy.  I've got until mid April to return anything we don't use to Ikea so that's my backup deadline but honestly, we're both over cooking out of the laundry, having the rest of the house in total chaos all the time and can't wait to have this project done.
 
SITE DESIGN BY DESIGNER BLOGS